Infrastructure branch Making all the difference

2012

Eiffage Metal took charge of preliminary studies, sourcing, manufacturing and offshore hook-up for the wellhead platform composed of:

  • A 1,400 t bridge, with equipment
  • A 800 t jacket, 36 m high
  • 1,200 t of piles
  • A 75 t gas flare